Garage Cleanup Phase 2

I pulled apart some shelves to get me access to all the rats nest of wiring.

I did get it up.  Unfortunately, I unplugged something and when I replugged it in, the UPS went nuts and fried itself.

Hope I can get some sort of repair on it.

Phase 1 was to get the new server built, phase 2 is get the wiring cleaned up.  This is going to take a few days.

I got the BNC connectors nice and neat, ran out of time though, need to get the PoE cameras next.  If there is time tomorrow, also hit the regular network connections.

 